MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://uqa.gangzhifhm.com

“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.
Marcos inspects rock shed project in Benguet
- Eala ousts Day, enters Guadalajara Open final
- NBI starts own inquiry of DPWH contracts
- Marcos urged to raise WPS resolution at UN
- Lacson lauds Leviste for arrest of DPWH engineer who offered P360M bribe
- Pakistanis no reprieve from floods yet
- ICC clears applications of 15 drug war victims to join proceedings vs Duterte
- LTO told to summon 2 DPWH engineers with fake driver’s license
- CFO moves office from QC to Pasay
- Labubu fans flock to stores after launch of mini dolls
- Thousands protest in Nepal over social media ban, corruption